Job Order |
Client |
Period |
Description |
EC Horní Suchá II. |
Organic technology s.r.o. |
05/2021-11/2022 |
Complete implementation of the Energy Centre - for waste treatment, including delivery of the design documentation. The purpose of the "Horní Suchá Energy Centre" is to use materials or secondary raw materials of a biological nature to produce concentrated organic fertiliser and biogas by anaerobic fermentation. |
REA Reconstruction of PS60003 MAKOTŘASY - boiler room |
GasNet, s.r.o. |
04-08/2022 |
Reconstruction of the boiler room for technological preheating of natural gas in the existing high-pressure regulation station in Makotřasy. The reconstruction was commissioned due to technical and technological outdated condition of the boilers and requirements for emission reduction. At the same time, the technological equipment for gas pressure regulation was partially reconstructed. In addition, the related equipment - control system (telemetry) and power wiring including replacement of the spare power supply - was modified as part of the reconstruction. |
Reconstruction of PS 60007 Štolmíř - boiler room + TLM |
GasNet, s.r.o. |
04-09/2022 |
The subject of the Work was the reconstruction of the boiler room for technological preheating of natural gas in the existing high-pressure regulating station, due to technical outdated condition of the boilers and reduction of emissions from the boilers. In addition, replacement of the boiler room internal equipment and modification of the related equipment - control system and power wiring, including replacement of the spare power supply. |
Replacement of boilers in the Morava area |
GasNet, s.r.o. |
05-09/2022 |
It was the replacement of outdated atmospheric boilers with condensing boilers. Replacement of boilers, flues, modification of existing installation including installation of the control and remote monitoring. Locations Olomouc, Nový Jičín, Havířov and Opava. |
Reconstruction of medium pressure control station KLADNO Otevřená |
GasNet, s.r.o. |
02-10/2022 |
Installation of a new high/medium pressure natural gas control station with an output of 1200 Nm3/h, including a high pressure inlet pipe DN80 and medium pressure industrial gas pipeline PE d160/DN150, and commissioning. Carrying out all necessary tests and inspections. |
Reconstruction of the Frenšát I Příčnice GPRS |
GasNet, s.r.o. |
08-11/2022 |
Construction of a new HP/MP regulation station building with an output of 4000 m3/h. The regulation station was delivered as a complete prefabricated building. The reconstruction included the execution including internal technology, new HP and MP pipeline sections, new earthing, new paved area, new fencing and new LV connections. New regulating station placed in place of existing one, existing brick regulating station dismantled and demolished. Uninterrupted natural gas supply was ensured during the reconstruction by means of a temporary HP/MP control station with an output of 1200 m3/h. The control station is equipped with preheating and telemetry. |
Reconstruction of the HP Plzeň Klatovská GPRS |
GasNet, s.r.o. |
02-09/2022 |
Complete reconstruction of the existing brick HP GPRS with connection to HP, MP and LP including fencing and electrical connection with a new electric pillar on Klatovská třída in Pilsen. Original HP GPRS physically liquidated. Untyped HP GPRS 6 000 m3/h - equipped with lighting, telemetry and flat roof. LP: DN 200 length: 1.5 m; PE 225 length: 3.5 m MP: DN 200 length: 1.7 m; PE 225 length: 10.0 m HP: DN 100 length: 6.7 m; DN 150 length: 18.5 m. |
Reconstruction of the HP Jilemnice II - Jinova GPRS |
GasNet, s.r.o. |
10/2021-08/2022 |
Removal of the building of the existing HP and MP GPRS Jilemnice Jinova including fencing and foundations. Construction of a new BMS facility for Jinova - 300 Nm3/h with medium pressure outlet. New HP, MP gas pipeline and gas metering and control kiosk built including internal technology, new inlet and outlet valves, new earthing, new paved area in front of the kiosk. New part of HP gas pipeline DN100, new part of MP gas pipeline PE dn160, dn100 and dn90, new gas control equipment with capacity 300 Nm3/h. |
Reconstruction of the Poruba 3 Čkalovova GPRS |
GasNet, s.r.o. |
11/2021-09/2022 |
Reconstruction of the existing medium pressure GPRS. The building itself and the internal technological equipment including the surrounding paved areas were repaired. The fencing was also replaced. Replaced the technology inside the building along with the connection to the existing MP and LP pipeline network. MP/LP control station with an output of 1200 (n)m3/hr. The actual GPRS machinery is designed as a two-line single stage with MP input 70-85kPa and LP output 1.9-2.1kPa. New inlet steel MP pipeline DN100, length 10 m, incl. 1x earth cap DN100 connected to the existing one. MP steel pipeline DN300. New outlet steel LP gas pipeline DN200, 10 m long, connected to existing LP PE gas pipeline Dn315. Existing LV connection, LV switchboard door in the fence will be replaced, switchboard on the facade replaced with a new one. GPRS fitted with recording equipment. |
Reconstruction of the Hranice - Nová ulice GPRS, RS34018 |
GasNet, s.r.o. |
06-11/2022 |
The subject of the implementation was the construction of a new GPRS building including internal technology, a new part of the HP gas pipeline DN100 and MP gas pipeline PE d225/PE d160, new grounding, data logger, new paved area, new fencing and new house LV distribution, new HP gas pipeline route. Machinery, GPRS 6000 (n)m3/h facility (non-typical GPRS) The GPRS machinery was delivered to site pre-assembled. Final assembly carried out on site. |
Reconstruction of the Jarcová GPRS |
GasNet, s.r.o. |
03-06/2022 |
New machinery for the 650 Nm3/h regulation set, including HP inlet pipeline, MP outlet pipeline and new parts of HP and MP pipelines. Double row, single stage HP/MP technology in a new concrete kiosk. New LV connection, new grounding system and data logger. New paved areas. |
Reconstruction of the Paskov GPRS, RS32150 |
GasNet, s.r.o. |
05-09/2022 |
Total refurbishment of existing 1200 Nm3/h HP GPRS. New GPRS is HP/MP type with 2000 Nm3/h output. The actual machinery is a double row single stage with HP inlet 23bar, MP outlet 2.8 bar. New LV connection, new grounding system and telemetry. New fencing and paved areas. As part of the refurbishment a replacement supply was proposed - a temporary single stage HP/MP GPRS with an output of 1200 Nm3/h. |
Reconstruction of the Opava-Kateřinky 1st stage, 1st part local networks |
GasNet, s.r.o. |
09/2021-08/2022 |
Construction of MP gas pipeline in total length 1091,26m of which PE dn63 - 728,11m. Connection to the existing PE gas pipelines was made with PE fittings of appropriate dimensions. The gas pipeline connections were made of PE 100 SDR 11 dn32 in the total length of 363.15m. A total of 52 gas pipeline connections were reconstructed and terminated in new or existing main gas shut-off boxes. |
Reconstruction of the Opava-Kateřinky 1st stage, 2nd part local networks |
GasNet, s.r.o. |
10/2021-10/2022 |
Construction of MP gas pipeline in total length of 1692,00 m - of which PE dn90 - 145,98 and PE dn63 - 145,98m. Connection to the existing PE gas pipelines was made using PE fittings of appropriate dimensions. The gas pipeline connections were made of PE 100 SDR 11 dn32 materials in the total length of 594.15m. The LP gas pipeline disconnection in the given location was made by means of SCHUCK SMU-K DN100 and DN150 blind couplings. The insulation on the ocell pipe was repaired with ANTICOR plastic tape, after which an electrospark test was carried out. |
Reconstruction of the Havířov 3rd stage, 1st part local networks |
GasNet, s.r.o. |
03-11/2022 |
Reconstruction of the existing low-pressure gas pipeline DN125 and DN150 made of steel in Mozartova Street. The existing gas pipeline is replaced by a new gas pipeline made of HDPE 100+ with a protective jacket in the dimension PE dn63. Pressure level LP changed to pressure level MP (MP - max. overpressure 0,4 MPa) after reconstruction in accordance with the City of Havířov Master Plan. The construction also includes the replacement of gas pipeline connections, including the possible relocation of the main gas shut-offs from individual buildings to newly built cabinets for the main gas shut-off with connection to the existing gas consumption facilities. Existing main gas shut-off cabinets re-fitted behind the main gas shut-off with an MP/LP gas pressure regulator and shut-off valve (ball valve of appropriate size). The total plan length of the reconstructed gas pipeline is approximately 356 m. The total number of reconstructed gas pipeline connections is 12. |
Reconstruction of the Havířov 3rd stage, 2nd part local networks |
GasNet, s.r.o. |
02-11/2022 |
The subject of the implementation was the reconstruction of the pipeline including connections and disconnections. MP gas pipeline Pe 100RC, dn110 and 63 with a total length of 712.20 m. MP gas pipeline connections Pe 100RC, dn 32 with a total length of 142.30 m. |
1115 - BoP CS Veselí - PS24 - Pressure air station |
NET4GAS, s.r.o. |
03-11/2022 |
As part of Construction No. 1115, the work of part PS24.1 - Pressure Air Station in the TPK Hall of the Veselí nad Lužnicí Compressor Station was carried out, consisting in the reconstruction of the technology of the pressure air station for the needs of the distribution of working pressure air. The new technology was connected to the existing stainless steel piping from 2021. The contract also included the preparation of the design documentation for the construction (PPD), the accompanying technical documentation (PTD) and As-Built Documentation. |
Reconstruction of ball valve pos. 5.2 in TU29J Strážovice |
NET4GAS, s.r.o. |
08/202104/2022 |
Replacement of the existing underground ball valve DN800 with a new one with the addition of a new pipe stop DN800. Mechanical installation work on the high pressure gas pipeline and construction and electrical installation wo |
Repair of the DN500 Vanovice gas pipeline |
Hroší stavby Morava a.s. |
04/2022 |
New insulation and cementing in the length of 24 m of the existing DN 500 steel pipeline |
Energocentrum Kostelec na Hané, extension of MP gas pipeline d160 |
Rayo Engineering, s.r.o. |
11/2021-03/2022 |
Installation of a new MP industrial gas pipeline PE d160, including its connection to the existing MP gas pipeline PE d160. Furthermore, installation of a new control device regulating the pressure of 300 kPa to 16 kPa. After the regulating device, installation of part of the internal piping of the MP industrial gas pipeline, including the DN300 storage vessel, fitting of the main gas shut-off box, connection of the cogeneration unit. |
Construction modifications of HP GPRS No. 415 Uhříněves - Netluky, Prague 22 |
Pražská plynárenská Servis distribuce, a.s. |
05-11/2022 |
Structural modifications on HP GPRS by complete replacement of the HP GPRS building, including foundations, paved areas, mechanical equipment, relocation of electrical metering pillars, metering pillars and main switch, new lightning arrestor system and grounding system, and new grounding network. Also as part of the maintenance works the following was carried out: a) Replacement of part of the HP inlet and MP outlet pipelines b) Replacement of existing electrical wiring from the new meter box to the new GPRS c) PS 01.2 - Gas Pipelines - Replacement of part of the HP inlet and MP outlet pipelines of the GPRS. |
Odorization station OSGC 03 |
t-gas, s.r.o. |
06-08/2022 |
Manufacture, installation and commissioning of odorisation station type OSGC 03 |
Odorization station OSGC EP-A03 |
TechnologyPipe Services s.r.o. |
04-07/2022 |
Production and installation of the odorization station and handover including design documentation |
H2 Pilot - hydrogen injection equipment into natural gas |
SPP-distribúcia Servis s.r.o. |
02-07/2022 |
Design of equipment for hydrogen injection into the gas pipeline and work associated with the manufacture assembly, certification, commissioning and subsequent functional test of the equipment, including H2 analyzer |
Reconstruction of sanitary facilities and changing rooms |
Linde Gas a.s. |
04-09/2022 |
Turnkey reconstruction of sanitary facilities and changing rooms in building No. p. 691, i.e. all supplies, works, auxiliary services, tests, revisions for proper and safe execution of the work in accordance with the applicable legislation and in compliance with the standards and quality according to ČSN standards. |
Cogeneration unit Orlová - additional propane starting |
Green Gas DPB, a.s. |
01-02/2022 |
Delivery and assembly of the pressure station, installation of medium and high pressure gas pipelines, connection of the station to the existing DN 150 mine gas pipeline at the splitting point. Structural modifications to the gas piping at the splitting point, including pressure tests and inspection of gas equipment, electrical inspections and functional tests. |
Supply of regulation station, odorization, semi-trailer and LNG storage tank assembly with odorization. |
AFP - CZ, spol. s r.o. |
07-12/2022 |
Production and delivery of 2 pcs of regulation equipment for mobile pressure station LNG-500 |