Basic informations - Connection of the biogas station Jelšava 2 to the SPP-D distribution system
Implementation Date: 09/2021
Client: PM, s.r.o.
Transfer station (without earthworks), HP connection (without earthworks), odorization station, SRRP + MaR, Delivery and installation of 2 pcs of containers, Mixer, HVAC (ventilation and air conditioning of the measuring station building), wiring (installation of lighting distribution in the mechanical and measuring container), power supply, gas detection signaling, propanization system (replacement of 3 pcs of LPG tanks á 4850 l).