Basic informations - Central Mine Cooling System in the Karviná Mine
Implementation Date: 2010 - 12/2012
Client: OKD, a.s., the Karviná Mine
Scope of work: complete implementation project, delivery, installation and commissioning of the equipment for the mine part of central air-conditioning with output of 10 MW and the option to increase output to 13 MW, installation of a surface line 2 x DN 350, pipe line 2 x DN 300 in a 960-metre pit, including pipeline relocation, mine installations with the use of the Siemag three-chamber exchanger, pipeline system in the mine for the delivery of cooled water, installation of 21 wind coolers, complete mine electrical installations, including control and regulation.