Basic informations - Reconstruction of High-pressure Gas Pipeline DN 500 PN 40 Stonava – Žukov, Phase 1, Part 1 and 3
Implementation Date: 2013 - 2015
Client: RWE GasNet, s.r.o.
This project consisted of the reconstruction of a high-pressure gas pipeline totalling 5,248 meters in length, during which the current gas pipeline DN 500 was replaced with a new one, placed along the original pipeline after excavation works and disassembly.