Basic informations - DN 400 PN 40 High-pressure Gas Pipeline Inlet for Peak Load Power Plant in Prostějov
Implementation Date: 04/2012 - 9/2012
Client: ADATO s.r.o., Organizational Component
The work included a “plug-and-go” delivery of DN 400 PN 40 high-pressure gas pipeline inlet with the total length of 3,132.5 m (including trenchless pipe laying under a railway and a state road) and gas metering station, including project documentation, engineering activity, and building permit arrangement. The connection provides natural gas supplies for power source – peak load power plant in Prostějov.